Sakaw Terrace Update for October 2017

Doug Kitlar stands on the main floor of the Sakaw Terrace construction site, looking out to the Bobcat skid flattening the wet soil where the first asphalt for the building’s main parking lot will be laid. He explains that this first layer may not last through the end of the construction but is being installed to help with the rest of the construction project by covering up the mud.

Sakaw Oct 2017 (3)

“The soil’s been so wet all summer, it’s been hard to move anything,” Kitlar explains. “The asphalt is going to be damaged by the end of the project as we keep moving materials and equipment across it, but it’s going to make our lives a lot easier as we move forward on the project. It will of course have the finished layer laid toward the end of the project.”

Kitlar’s role as GEF Seniors Housing’s Director of Facility Management has seen him work on his fair share of new building projects. Sakaw Terrace has seen Kitlar and the rest of the teams with GEF Seniors Housing and Chandos (Sakaw Terrace’s general construction contractor) branch out into trying new approaches while completing the building project. It’s been close to one year since shovels first broke ground on Sakaw Terrace and the project is moving fast.

Sakaw Oct 2017 (2)

All four above ground floors and the underground parking garage have all had concrete poured for the flooring to the north wings and central core, making it possible to walk through every floor of the building (with the right safety gear, of course). The structural steel frame is nearing completion, giving the building its familiar shape. The remaining concrete will be poured over the next month.

Sakaw Oct 2017 (10)

With progress moving so smoothly on Sakaw Terrace, Kitlar already has his mind on developing show suites. He explains that the main floor will display one lodge room and one apartment room that will first be used for weather and pressure testing, to ensure that no matter the weather outside the inside of the building and the suites will stay dry. Once the suites meet all the demands for weather and pressure testing, they will be an established standard for the finishes in all suites in the building and ultimately become the show suites for prospective tenants.

Sakaw Oct 2017 (7)

“In about a month or so, we’ll start putting together the show suites to be pressure tested,” says Kitlar. “If things keep moving as they are now, we should be able to show our future residents and tenants the show suites by spring 2018.”

The next steps for the construction crew that will take the project into the New Year include paving the west side parking lot, finishing the ramp down to the underground parkade, securing the last of the structural steel walls, and installing the last of the roofing.

Sakaw Oct 2017 (5)

Standing on Sakaw Terrace’s roof, there is a great view of the city’s south side and of downtown Edmonton’s skyline. The roof is sturdy and secure and the ventilation system vents are already being installed. Kitlar smiles as he looks out to the Edmonton skyline and reminisces about his affinity for going on buildings’ roofs.

“When I first started with GEF Seniors Housing, I went out on to every building’s roof to get to know everything with all the buildings,” Kitlar explains. “I took a photo from each rooftop and displayed them to the managers and had them guess where each photo was taken. With this unique view, no one will have problems guessing any photo taken from here.”

Sakaw Oct 2017 (1)

Thoughts on "Sakaw Terrace Update for October 2017"

  1. Joanne Dube

    Love what I have read and seen with the picture and looking forward to the show suites opening. Also looking forward to filling out an application to move into Sakaw Terrace

    LikeLiked by you

  2. William Reidlinger

    Hello, also interested as to when the show suites will be opening as we live in Surrey b.c and will make a trip to Edmonton when they RE ready to see.

    LikeLiked by you

    1. gefcommunityconnections

      Hello William. Thank you for your inquiry. The show suites will be available in May, We do not have an exact date at the moment, but if you follow us on Facebook, we will post updates there. We also have a Sakaw Terrace Community Queries Facebook Group if you would like to join and ask questions there: https://www.facebook.com/groups/sakawterrace/ Thank you!

      LikeLiked by you